Xtramus NuStreams-P9M V2.1 Bedienungsanleitung Seite 46

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 46
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 45
46
5.3. Starting DUT Tests with NuPAD
NuPAD has 3 buttons on its front panel: “|| Pause”, “ Stop”, and “
Run”. After connecting NuPAD
with NuStreams-P9M with Cat-5 cable, you can start/pause/stop DUT tests with these 3 buttons.
Please see the table down below for a detailed description about these buttons’ functions.
Function Button Description
Start Testing All Tasks
in Current Run
Run Press Run” to start all Tasks in
the current Run. The current Run
(Run 1~3) about to be tested will
be displayed on the upper-right
part of LCD.
Switching Current Run || Pause
+
Stop
To change the current Run (Run 1~3), press both “|| Pause” and “
Stop” buttons at the same time. If NuPAD is current in Run 1, pressing
both “|| Pause” and “Stop” buttons at the same time will switch the
current Run from Run 1 to Run 2.
Pause Current Running
Test
|| Pause
Press “|| Pause” button once to pause the current running test. Press “||
Pause” button again to resume the test.
Stop Current Running
Test
Stop Press “Stop” button once to stop the current running test.
XTRAMUS TECHNOLOGIES
®
Website: www.Xtramus.com
Seitenansicht 45
1 2 ... 41 42 43 44 45 46

Kommentare zu diesen Handbüchern

Keine Kommentare